Our Recent Completed Project

KARADENIZ HOLDING

Date: Oct 2010 to Sept 2011

Projects Scope

GENERATOR SYSTEMS AND MSB SYSTEM IN P 888

  • Completion 100% 100%

Responsibilities and Service

  Supervising.

  Worker Handling.

  Electrical Systems Wiring.

  Electrical power cable termination.

  Electrical power cable testing and commissioning.

NINGALOO VISION

Date: Oct 2010 to Sept 2011

Projects Scope

ELECTRICAL LIGHTING SYSTEM INSTALLATION & INSTRUMENT INSTALLATIONS

  • Completion 100% 100%

Responsibilities and Service

   Worker Handling.

   Electrical Systems Wiring.

   Electrical power cable termination.

   Instruments termination of Pressure transmitters & Temperature transmitters.

  Instrumentation cable installation & Testing.

FPSO MODEC JUBILEE

Date: Oct 2010 to Sept 2011

Projects Scope

PIPERACKS 5, 6, 7 & 8 

  • Completion 100% 100%

Responsibilities and Service

  Electrical Cable ladder Supports & Cable ladder Installation.

  Electrical & Instrumentation cable Earth & continuity checking.

  Lighting installation with termination.

  Fire & Gas System installation with termination.

  PA/GA System Installation with termination.

FPSO BP ANGOLA

Date: Oct 2010 to Sept 2011

Projects Scope

PIPERACKS 7, 8, 9 & INLET SEPARATION MODULE

  • Completion 100% 100%

Responsibilities and Service

  Electrical cable ladder and Tray installation.

  Instrument installation for process control.

  Electrical cable installation and Termination.

  Chemical Injection, Fusible loops and Process Tubing Installation.

  Oil and Pneumatic tubing and fitting installation.

  Lighting installation with termination.

  Fire & Gas System installation with termination.

  PA/GA System Installation with termination.

  Process Junction Boxes Installation with termination.

  Installation and termination of Transmitters and Detectors

CONOCOPHILLIPS CONSTRUCTION SDN.BHD

Date: Nov 2011 to Mar 2012

Projects Scope

SPAS – Solar Panel Assembly System.

  • Completion 100% 100%

Responsibilities and Service

  PCBA – Screw Fastening Unit

  Cobra 10 Second Screw Fastening & Torque Checking Unit

  Disc Assembly Unit

  PLC Panel Assembly

  Panel wiring designing

  Machine Wiring

  Instrumentation Tubing

  Control and installation of PLC

VMEPROCESS PTE LTD AND KEPPEL & JURONG SHIPYARD

Date: Mar 2012 to April 2013

Projects Scope

> Erection of Power and Control system in Keppel Tuas, Singapore

>Erection of High tension Cables & Power Panels in Central Exercise in keppel

>Erection of Illuminators in Central Exercise of jurong shipyard

>Erection of Submarine Motors and Starter Panels in Jurong Shipyard

  • Completion 100% 100%

Responsibilities and Service

  High tension & Low tension power Cable Wiring

  High tension & Low tension panel Control Wirings

  High tension Distribution Panel Termination

  Domestic Buildings Wiring & Maintenance

  Panel Wiring Designing

  Panel Wiring and Termination

  Control and Installation of PLC in Domestic Control

  Control and Installation of Illumination devices

  Control and Maintenance of Submarine Pumps & Control Panels

OFFSHORE CONSTRUCTION SERVICES

ELECPEC SDN BHD

Date: Nov 2011 to Mar 2012

Projects Scope

SPAS – Solar Panel Assembly System.

  • Completion 100% 100%

Responsibilities and Service

  OSX WHPPDU module

  Worker Handling

  Electrical Systems Wiring

  Electrical power cable termination

  Instruments termination of Pressure transmitters & Temperature transmitters

  Instrumentation Tubing

Instrumentation cable installation & Testing.

KEPPEL SHIPYARD TUAS

Date: Nov 2011 to Mar 2012

Projects Scope

SPAS – Solar Panel Assembly System.

  • Completion 100% 100%

Responsibilities and Service

  PCBA – Screw Fastening Unit

  Cobra 10 Second Screw Fastening & Torque Checking Unit

  Disc Assembly Unit

  PLC Panel Assembly

  Panel wiring designing

  Machine Wiring

  Instrumentation Tubing

  Control and installation of PLC

  Checking and Troubleshooting of Controls

  Control and installation of drivers.